Skip to content

Nairobi · East Africa

Case studies

Real infrastructure problems, solved on site.

How organisations across East Africa cut downtime, secured their networks and automated manual work with TechBytes.

Unplanned downtimehours per monthBEFOREAFTER−62%DOWNTIMEMILESTONESSite audit completeEdge gateways liveERP integrationHandover & training3 plants · 16 weeksManufacturing, Kenya
Container trucks heading inland on a Kenyan highway-84% Paperwork time per shipment
Logistics & Distribution27 Aug 2026

AI Document Processing Cuts Shipment Paperwork Time by 84% for a 3PL

OCR and LLM extraction with human review turned waybills, invoices and customs documents into clean WMS and ERP data for a regional freight firm.

  • Average document handling time per shipment file fell from 38 minutes to 6 minutes.
  • Field-level data-entry errors dropped from 4.2% to 0.6%, sharply reducing customs queries and invoice disputes.
  • 71% of documents now pass straight through after automated checks, with the rest routed to a reviewer with the uncertain fields highlighted.
Read case study
Two pupils in school uniform working on a laptop in their classroom1,850 Devices centrally managed
Education22 Jul 2026

Digital Classrooms for a Four-School Group, Managed End to End

Devices, an LMS, safe internet and M-Pesa fee payments rolled out across four private schools, with 92% of teachers now using the LMS weekly.

  • 1,530 student Chromebooks and 320 teacher laptops enrolled in central management, with lost-device lock and remote wipe.
  • Weekly LMS use among teachers rose from 18% to 92% by the end of the second term.
  • Fees paid within 30 days of term opening increased from 61% to 87% after M-Pesa payments went live in the parent portal.
Read case study
Mobile network tower against a clear sky, providing backup LTE connectivity99.9% WAN availability
Healthcare21 May 2026

Keeping EMR Online at 14 Clinics with Multi-Site SD-WAN

Dual-ISP SD-WAN, a cabling refresh and 24/7 monitoring took a Kenya and Uganda clinic chain to 99.9% WAN availability for its EMR.

  • Average EMR downtime fell from 7.8 hours to 0.8 hours per clinic per month.
  • When a primary fibre link fails, traffic moves to the backup path in under five seconds, keeping EMR sessions open.
  • The NOC now detects link problems in about two minutes, often before clinic staff notice, and logs faults with the ISP directly.
Read case study
Students seated in a tiered university lecture hall4x Peak Wi-Fi clients
Education18 Feb 2026

Rebuilding a University Network for 9,000 Students and Wi-Fi 6

A fibre backbone, switching refresh and high-density Wi-Fi 6 that quadrupled wireless capacity and lifted core uptime to 99.9% across two campuses.

  • Peak concurrent wireless clients increased from roughly 1,800 to 7,400 without degrading performance in lecture halls.
  • Core network uptime improved from 97.2% to 99.9%, including through scheduled and unscheduled power outages.
  • Inter-building links moved from 1 Gbps to 10 Gbps, with spare fibre cores for 40 Gbps upgrades.
Read case study
Close-up of a glowing circuit board with a digital security padlock motif9 Security zones (from 1 flat network)
Manufacturing9 Feb 2026

Securing a Food Processing Plant Floor with OT/IT Segmentation

How we segmented a dairy and juice processor's flat network into security zones, locked down remote access and built a tested recovery plan.

  • SCADA, PLC and batch-control systems now sit in dedicated zones that office devices cannot reach directly.
  • Eleven unmanaged remote-access tools were removed and replaced by a single approved, logged vendor access path.
  • A full restore of the batch-control server and ERP was tested at under four hours, against an estimated three days before.
Read case study
Point-of-sale terminal on a retail shop counter-15 days Days sales outstanding
Retail & Distribution12 Nov 2025

Cutting Order-to-Cash by 15 Days for an FMCG Distributor

How we automated ordering, M-Pesa reconciliation and KRA eTIMS invoicing for a distributor serving 1,200 retail outlets across Kenya.

  • Days sales outstanding reduced from 41 to 26 days within two quarters of go-live.
  • 94% of M-Pesa receipts are matched to the correct invoice automatically, with the remainder routed to a short exception queue.
  • Unapplied cash at month end dropped from about KES 18 million to under KES 2 million.
Read case study
Technician grinding a machine part with sparks flying on a factory floor-62% Unplanned downtime
Manufacturing14 Oct 2025

Cutting Unplanned Downtime 62% Across Three Plants with Automation

Predictive maintenance and automated spare-parts reordering for a three-plant Kenyan manufacturer, linking PLC data to ERP and live dashboards.

  • Unplanned downtime fell from an average of 41 hours to 15.5 hours per month across the three plants.
  • Maintenance tickets are now raised automatically within two minutes of an alarm condition, with machine history attached.
  • Critical spare parts are reordered in Odoo when stock reaches a calculated minimum, cutting stockouts from 13 to 2 per quarter.
Read case study

Talk to an engineer

Want results like these?

Start with an on-site audit. We map your network, devices and risks, then hand you a prioritised, costed plan.

Chat on WhatsApp

Prefer a call? +254 711 974 716

WhatsApp